A sustainable solar powered lighting solution – Regent Elia classic solar lantern installation at Sneaton Castle.

The customer at Sneaton Castle was looking for a solution to install lighting in an area that was not accessible with mains power. The Regent Elia classic lantern with a solar column wrap around provided the perfect solution. The classic styling of the lantern fitted in perfectly with the castle and its surroundings while the fitting is 100% solar powered meaning there was no requirement for trenching and cabling for mains power.

The customer was very pleased with the result and has been impressed with performance of the Regent Elia. Proven to last all night long, even in the darkest winter months!


Tobia Tabor Ofir 2L – matching mains powered light fittings, were also installed to complement the solar powered light fittings.